Hwy 77/I-10 Utility Extension Project

Scope of Work:

  • 16" Potable Water Well
  • Water Mains
  • Gravity Sanitary Sewer Mains
  • Lift Station
  • 300,000 Gallon Potable Water Storage Tower

Status: Construction in progress.

Water Tank 101717Chipley Reclaimed Water

Scope of Work:

Prepare a facilities planning document that identifies the methods that are available to discharge the City’s reclaimed water and identify properties that are available for said use and available for sale and or lease.

Status: Facilities plan to be completed by September 2017

Existing Reclaimed Water
5th Street Drainage Improvements

Scope of Work:

Design and construction of a storm-water pond, associated storm-water piping and storm-water control structures. The project also consists of installing approximately 400 lin ft of reinforced concrete pipe (RCP) to cover an open ditch.


Status: Design Phase in progress

5th St Drainage
5th Street Milling, Resurfacing & Drainage Improvements Phase I

Scope of Work:

US 90 to Old Bonifay Rd (CR 166) a total of .48 miles will be milled and resurfaced with drainage improvements at the intersection of 5th St. and Old Bonifay Rd.

Status: Construction Completed.

092017 5th St

5th Street Milling, Resurfacing & Drainage Improvements Phase II

Scope of Work:

South Blvd to US 90 a total of .52 miles will be milled and resurfaced with drainage improvements at the intersection of 5th St and Forrest Ave.

Status: Design Phase in progress.

5th Street Phase II

Pine Ave Sidewalk

Scope of Work:

Construction of sidewalk along Pine Ave from Usery Rd to Third St.


Status: Construction Completed.

Pine Ave Sidewalk

Pals Park Phase VI

Scope of Work:

  • Renovate/replace existing playground equipment .
  • Renovate/replace baseball & softball fields
  • Renovate/replace existing concession stand and restrooms
  • Renovate/replace bleachers @ baseball field
  • Install new security lighting
  • Construct new picnic facilities

Status: Construction in progress.

Pals Park Main Field Eastside 9

Pals Park - Phase VII

Scope of Work:

  • Renovate/replace existing playground equipment
  • Renovate/replace baseball & softball fields
  • Renovate/replace existing concession stand and restrooms
  • Renovate/replace bleachers @ baseball field
  • Install new security lighting
  • Construct new picnic facilities

Status: Construction in progress.

Pals Park Main Field Northside 11


Pals Park Phase VIII

Scope of Work:

  • Construct new playground equipment
  • Construct new picnic pavilion
  • New sidewalks
  • Renovate existing restrooms 
  • Renovate playground equipment.

Status: Construction in progress

Pals Park Phase VIII